Broadway |
46 |
P&Z 23-026 |
Apr 06 , 2023 |
Decision
|
Signage Plan
|
Staff Memo
|
|
CRG Graphics
|
Broadway |
57 |
PB 2018-08 |
May 02 , 2019 |
Broadway 57.pdf
|
Broadway 57 - Plan Set.pdf
|
|
|
Centrie Realty, LLC
|
Broadway |
83-91 |
PB 2014-15 |
Jun 19 , 2014 |
legacy/documents/Broadway83-91.pdf
|
legacy/documents/Broadway 83-91 - Plans (POST).pdf
|
legacy/documents/rnd/Broadway 83-91 - Staff Report (POST).pdf
|
|
|
Broadway |
761 |
ZBA 2012-92 |
Nov 28 , 2012 |
legacy/documents/Broadway761.pdf
|
legacy/documents/Broadway761Plans.pdf
|
legacy/documents/rnd/Broadway761_STAFF_REPORT.pdf
, legacy/documents/ZipCarCondition_1.pdf
|
|
|
Broadway |
118-120 |
PB 2012-15 |
Aug 23 , 2012 |
legacy/documents/Broadway118-120.pdf
|
legacy/documents/Broadway 118-120 - Plans (POST)_0.pdf
|
legacy/documents/rnd/Broadway 118-120 - Staff Report (POST).pdf
|
|
|
Broadway |
906-908 |
ZBA 2015-32-E1-10/17 |
Nov 08 , 2017 |
Broadway906-908.pdf
|
|
Broadway 906-908 - Staff Report - ZBA 2015-32-E1-10-2017 Time Extension.pdf
|
|
Siyuan He
|
Broadway |
67 |
PB 2017-01 |
Mar 02 , 2017 |
Broadway67.pdf
|
Exterior Rendering 01-25-17.pdf
, Plan Set 12-27-16.pdf
|
Broadway 67 Staff Report.pdf
|
|
CAS Foundation
|
Broadway |
176-182 |
ZBA 2018-79 |
Jun 20 , 2018 |
Broadway176-182 WWOP.pdf
, Broadway176-182 WWOP (MEMO).pdf
|
|
|
|
Yihe Patsy’s Corporation
|
Broadway |
205 |
PB 2013-06 |
Apr 04 , 2013 |
legacy/documents/Broadway205.pdf
|
legacy/documents/Plans.03.11.2013.pdf
, legacy/documents/TIAS Final.pdf
, legacy/documents/Shadow Studies (POST).pdf
|
legacy/documents/rnd/Brodway205StaffReport.pdf
|
|
|
Broadway |
46 |
PB 2017-07 |
May 04 , 2017 |
Broadway46.pdf
|
Floor Plans 4-21-17.pdf
, Schematic Facade Design 3-18-17.pdf
, Plan Set 4-26-17.pdf
|
46 Broadway Staff Report.pdf
, 46 Broadway UPDATED Staff Report.pdf
|
|
Taco Loco Mexican Grilled LLC
|
Broadway |
114 |
ZBA 2018-51 |
May 02 , 2018 |
Broadway114 WWOP.pdf
|
|
|
|
116 Broadway LLC
|
Broadway |
483 |
P&Z 2023-016 |
Apr 05 , 2023 |
|
|
Staff Memo
|
|
Tavis Babbitt
|
Broadway |
1147 |
ZBA2008-17 |
|
|
|
|
|
|
Broadway |
114-120 |
P&Z 22-171 |
Apr 06 , 2023 |
Decision
|
Narrative.pdf
|
Staff Memo
|
|
Good Food Restaurant, LLC
|
Broadway |
70 |
PB 2017-13-R1-11/18 |
Dec 13 , 2018 |
70 Broadway_0.pdf
|
18.10.30_70Broadway_Plans.pdf
, 18.10.30_70Broadway_AccessibilityLetter.pdf
|
70 Broadway (revision) Staff Report.pdf
|
|
Juan Vasquez and Maria Monge Sibrian
|
Broadway |
2-8 |
PB 2014-12 |
May 08 , 2014 |
legacy/documents/Broadway2-8_0.pdf
|
legacy/documents/COMBINED (POST)_8.pdf
, legacy/documents/TA_26MARCH2014_REV2 (POST).pdf
, legacy/documents/Site Plan (POST)_0.pdf
, legacy/documents/Drainage Report.pdf
, legacy/documents/Traffic Assessment Updated (POST).pdf
, legacy/documents/COMBINED (POST)_9.pdf
, legacy/documents/Broadway2-8Plans2014.05.pdf
|
legacy/documents/rnd/Broadway 2-8 - Staff Report (POST)_0.pdf
|
|
|
Broadway |
864 |
ZBA2009-63 |
|
|
|
|
|
|
Broadway |
130 |
PB 2012-03 |
Mar 15 , 2012 |
legacy/documents/Broadway130.pdf
|
legacy/documents/130BroadwayPlans.pdf
|
legacy/documents/rnd/Broadway130RestaurantStaffReport.pdf
|
|
|
Broadway |
337-341 |
PB 2014-03 |
Feb 20 , 2014 |
legacy/documents/Broadway337-341.pdf
|
legacy/documents/Broadway337-341Plans.pdf
, legacy/documents/Broadway337-341PlansUpdated.pdf
|
legacy/documents/rnd/Broadway337-341StaffReport.pdf
, legacy/documents/Broadway337-341StaffReport2014.03.06_0.pdf
|
|
|
Broadway |
160 |
P&Z 21-070 |
Aug 13 , 2021 |
P&Z 21-070 Decison - Stamped.pdf
|
MARLONS BARBERS shop drawing (1) (1).pdf
|
|
|
RCG 60 Broadway LLC
|
Broadway |
282 |
PB 2016-22 |
Feb 02 , 2017 |
Broadway282.pdf
|
|
|
|
Craig Murphy, Cambridge Repro-graphics
|
Broadway |
176-182 |
PB 2017-22 |
Jun 21 , 2018 |
|
Broadway 176-182 - Patsy's - Plans.pdf
, broadway-176-182-final-plan-set-pb-6-21-2018.pdf
, Broadway 176-182 - Oct 4 2018 PB Hearing Plans.pdf
, Broadway 176-182 - Plans for December 13, 2019 ZBA.pdf
, Broadway%20176-182%20-%20Plans%20121319%20%28POST%29.pdf
|
Broadway 176-182 - Staff Report for 6-21-2018 - POST.pdf
|
|
Yihe Patsy's Corporation
|
Broadway |
144 |
PB 2014-36 |
Oct 16 , 2014 |
legacy/documents/Broadway144.pdf
, Broadway144 (MEMO)_0.pdf
|
legacy/documents/Broadway 144 - Plans.pdf
|
legacy/documents/rnd/Broadway144StaffReport.pdf
|
|
|
Broadway |
323 |
PB 2018-10 |
Jun 07 , 2018 |
Broadway323.pdf
|
Modified Signage.pdf
|
323 Broadway Staff Report.pdf
|
|
Somerville Retirement Board c/o Michael Pasquariello, Executive Director
|
Broadway |
182 |
PB 2013-16-E1(11/2015) |
Dec 10 , 2015 |
Broadway176-182.pdf
|
|
Broadway182StaffReportTimeExtension_0.pdf
|
|
Yihe Group
|
Broadway |
114-120 |
PB 2019-13 |
May 16 , 2019 |
Broadway 114-120 Broadway.pdf
|
Broadway 114-120 - Plan Set July 19 2019 PB.pdf
, Broadway 114-120 - Updated plan set for August 8 2019 PB.pdf
|
Broadway 114-120 - Staff Report - Revision to SP.pdf
|
|
GoodFood Restaurant Group, LLC
|
Broadway |
1154 |
ZBA 2014-72 |
Aug 20 , 2014 |
legacy/documents/Broadway1154_0.pdf
|
legacy/documents/DRC Presentation 4-3-2014.pdf
, legacy/documents/DRC Submission 2014-05-23.pdf
, legacy/documents/Broadway1154Plans140609.pdf
, legacy/documents/Broadway 1154Plans140820.pdf
, legacy/documents/Broadway 1154Plans140820_0.pdf
, legacy/documents/Broadway 1154Plans140820sup.pdf
|
legacy/documents/rnd/Broadway1154StaffReport.pdf
|
|
|
Broadway |
898 |
ZBA 2015-108 |
Jan 20 , 2016 |
Broadway898.pdf
|
898BROADWAYPLANS.pdf
|
Broadway898StaffReport.pdf
|
|
Amanda Parisi
|
Broadway |
102-104 |
PB 2019-12 |
Apr 18 , 2019 |
Broadway 102-104.pdf
|
19.03.06_102-104 Broadway_Plan Set.pdf
|
102-104 Broadway Staff Report.pdf
|
|
Gauchao Brazilian Cuisine, LLC
|
Broadway |
130 |
PB 2011-02-R1 (1/2012) |
Feb 02 , 2012 |
legacy/documents/Broadway130_R1-2012_.pdf
|
legacy/documents/130 Broadway Somerville_Pictures.pdf
|
legacy/documents/rnd/Broadway130StaffReport.pdf
|
|
|
Broadway |
67 |
P&Z 21-005 |
Aug 05 , 2021 |
Broadway 67 Stamped Decision (Minor SPA)_0.pdf
, Broadway 67 Stamped Decision (SP & SPA)_0.pdf
|
Broadway 67 - Drawings (6-7-21).pdf
, Broadway 67 - 2021 01 29 UDC - Revised.pdf
, Broadway 67 - Narrative.pdf
, Broadway 67 - Plot Plan.pdf
, Broadway 67 - TAP.pdf
, Broadway 67 - TIS Appendices.pdf
, Broadway 67 - TIS.pdf
, NM1 & NM2 Report (Submitted 4.9.21).pdf
, 67 Broadway - Certification of Receipt of Materials - OSE.pdf
, Broadway 67 - S&R Questionnaire.pdf
|
Broadway 67 - UDC Recomendation 2021 03 11.pdf
, Broadway 67 - Neighborhood Meeting Minutes.pdf
, Broadway 67 - Staff Memo 2021.07.22.pdf
|
|
Revolutionary Clinics II, Inc.
|
Broadway |
1119-1133 |
ZBA 2013-73-E1 (7/2015) |
Aug 19 , 2015 |
legacy/documents/Broadway1119-1133_0.pdf
|
legacy/documents/ReasonForHardship.pdf
|
legacy/documents/rnd/Broadway1119-1133TimeExtensionStaffReport.pdf
|
|
|
Broadway |
1157-1161 |
ZBA 2015-109 |
Jan 20 , 2016 |
Broadway1157-1161.pdf
|
1157-1161 Broadway Plans.pdf
|
Broadway 1157-1161SR.pdf
|
|
Devon S. Trevelyan
|
Broadway |
701 |
2015-58 |
Jan 20 , 2016 |
Broadway701(Revised).pdf
|
Broadway 701 - Final Plans.pdf
|
Broadway 701 - Updated Staff Report.pdf
|
|
Bell Atlantic Mobile of Massachusetts Corporation, Ltd., d/b/a Verizon Wireless
|
Broadway |
708 |
ZBA2008-45 |
|
|
|
|
|
|
Broadway |
331-333 |
PB 2012-11 |
Aug 02 , 2012 |
legacy/documents/Broadway331-333.pdf
|
legacy/documents/Broadway 331-333 - Plans.pdf
, legacy/documents/Broadway 331-333 - Photo Sims.pdf
, legacy/documents/Broadway 331-333, Sheet A-1 Revised 8-16612 stamped.pdf
|
legacy/documents/rnd/Broadway 331-333 - Staff Report POST_0.pdf
|
|
|
Broadway (Clarendon Hill Towers) |
1366 |
ZBA2009-47 |
|
|
|
|
|
|
Broadway / Temple |
315 / 18 |
PB 2012-22 |
Feb 21 , 2013 |
legacy/documents/Broadway315-TempleSt18.pdf
|
legacy/documents/12025_Submission_2012-12-17.pdf
, legacy/documents/315-Broadway_Somerville_2013-03-04.pdf
, legacy/documents/EnvironmentalDocumentation.pdf
, legacy/documents/TrafficReport-Final-05-29-13.pdf
, legacy/documents/Plans 315 Broadway 052313.pdf
, legacy/documents/Environmental Report UST-Somerville.pdf
, legacy/documents/061213 PROGRESS SET 315 BROADWAY (POST).pdf
, legacy/documents/Compliance w Stormwater Policy.pdf
|
legacy/documents/rnd/Broadway315Temple18StaffReport.07.05.13.pdf
, legacy/documents/Broadway315Temple18StaffReport.03.28.13.pdf
, legacy/documents/Broadway315Temple18StaffReport 07.16.13.pdf
|
|
|
Bromfield Rd |
61 |
ZBA 2011-42 |
Jun 08 , 2011 |
legacy/documents/BromfieldRd61.pdf
|
legacy/documents/BromfieldRd61Plans.pdf
|
legacy/documents/rnd/BromfieldRd61StaffReport.pdf
|
|
|
Bromfield Rd |
106 |
ZBA 2019-44 |
Jun 05 , 2019 |
Bromfield Road WWOP.pdf
|
Plan Set- Initial 4.23.19.pdf
|
|
|
Cristian Dos Santos
|
Bromfield Rd |
85 |
ZBA 2014-27 |
May 07 , 2014 |
legacy/documents/BromfieldRd85.pdf
|
legacy/documents/Bromfield Rd 85 - Plans (POST).pdf
|
legacy/documents/rnd/Bromfield Rd 85 - Staff Report (POST).pdf
|
|
|
Brook Street |
18 |
ZBA 2017-43 |
Oct 18 , 2017 |
BrookSt18 WWOP.pdf
|
Plan Set 8-31-17_0.pdf
|
18 Brook St Staff Report.pdf
|
|
Waemen Lung and Waelim Lung
|
Burnham St |
28 |
ZBA2008-55 |
|
|
|
|
|
|
Burnside Ave |
18 |
ZBA 2014-128 |
Jan 07 , 2015 |
legacy/documents/BurnsideAve18.pdf
|
legacy/documents/PlansBurnsideAve18.pdf
|
legacy/documents/rnd/StaffReport_BurnsideAve18.pdf
|
|
|
Butler Dr / Temple St |
16 / 100 |
ZBA 2007-03-R5-4/2012 |
May 16 , 2012 |
legacy/documents/ButlerDr16-TempleSt100.pdf
|
legacy/documents/SPV 3_Combined Plans (POST).pdf
, legacy/documents/SPV 3_Renderings (POST).pdf
, legacy/documents/SPV 3 Elevation Changes Description 05.09.12 (POST).pdf
, legacy/documents/2012.04.26_CWDRC_Recommendations_Minutes.pdf
, legacy/documents/2006-10-10 Traffic Impact and Access Study (POST).pdf
|
legacy/documents/rnd/Butler Dr 16 - Temple St 100 SP Revision 5 STAFF REPORT (POST).pdf
|
|
|
Butler Dr / Temple St (St. Polycarps) |
16 100 |
ZBA2007-03-R0409 |
|
|
|
|
|
|
Butler Dr / Temple St (St. Polycarps) |
16 100 |
ZBA2007-03-R0308 |
|
|
|
|
|
|
Calvin St |
19-21 |
ZBA 2013-86 |
Dec 11 , 2013 |
legacy/documents/CalvinSt19-21.pdf
|
legacy/documents/COMBINED (POST)_1.pdf
, legacy/documents/Updated Plan 1.2.2014 (POST).pdf
|
legacy/documents/rnd/Calvin 19-21 - Staff Report (POST).pdf
|
|
|
Calvin St |
23-25 |
ZBA 2013-64 |
Nov 20 , 2013 |
legacy/documents/CalvinSt23-25.pdf
|
legacy/documents/Combined (POST)_1.pdf
|
legacy/documents/rnd/Calvin 23-25 - Staff Report.pdf
|
|
|
Calvin St |
23-25 |
ZBA 2013-64-R1-12/2014 |
Jan 21 , 2015 |
legacy/documents/CalvinSt23-25_0.pdf
|
legacy/documents/Plans (POST)_40.pdf
|
legacy/documents/rnd/Calvin 23-25 - Staff Report (POST).pdf
|
|
|