Broadway |
28-44 |
P&Z 23-061 |
Nov 02 , 2023 |
Decision
|
Major Amendment Narrative
, Prior Approved Plans
, Prior Planning Board Decision
, Revised Plans
, Neighborhood Meeting Report
, Supporting Memorandum from Applicant
|
Staff Memo
|
|
Lower Broadway Development LLC
|
Prospect Street |
32 |
P&Z 23-064 |
Nov 02 , 2023 |
Prospect St 32, P&Z 23-064 - Decision Stamped 20231208.pdf
|
Narrative
, Supplemental Narrative
, Floor Plans & Elevations
, Maps
, Neighborhood Meeting Report
|
Staff Memo
|
|
Life Alive
|
Broadway |
620 |
P&Z 23-055 |
Nov 01 , 2023 |
Decision
|
Application
|
Staff Memo
|
|
620 Broadway, LLC
|
College Ave |
118 |
ZP23-000032 |
Oct 04 , 2023 |
Decision
|
Narrative
, ZBA 2017-88 Decision
, ZBA 2017-88 Elevations
, ZBA 2017-88 Floor Plans
, As-Built Site Plan
, As-Built Floor Plans
, Supplemental Information
, Certificate of Occupancy
|
Staff Memo
, Staff Memo Addendum
|
|
Havurat Shalom Community Seminary, Inc., c/o Meredith Porter
|
Mystic Ave |
45 |
P&Z 22-029 |
Sep 07 , 2023 |
|
Master Plan Narrative
, Neighborhood Meeting Report
, Illustrative Plat Plan
, Illustrative Site Plans
, Massing Illustrations & Perspectives
, Planning Board Presentation
, Phasing Plan
, Comprehensive Shadow Study
, Utility Infrastructure Plan
, Stormwater Management & Green Infrastructure Plan
, Civic Space Study
, Green Building Report
, Sustainability Documents
, Mobility Management Plan
, Transportation Access Plan
, Transportation Impact Study
, Revised Plan Set
, Revised Landscape Plan
, Revised Civic Space Study
, Presentation
, Revised Narrative
, Revised Plot Plan
, Revised Context & Site Plans
, Loading Memo
, Revised Green Building Report
, Revised Sustainable Buildings Questionnaire
, 10/19 Presentation
, Updated TAP
, Updated Site Plan
, Updated Architectural Plans
, Updated Landscape Plans
, Updated Narrative
, Sustainable Buildings Questionnaire
, Loading Memo
, Green Building Report
, PB Presentation
|
Staff Memo
, Supplemental Staff Memo 9/29/23
, Supplemental Staff Memo 11/09/23
, Supplemental Staff Memo 6/14/24
|
|
Mystic 45 Development LLC
|
McGrath Hwy |
394 |
ZP23-000036 |
Sep 07 , 2023 |
Decision
|
Narrative
, Plans - Plan Revision
, Supplemental Plans
|
Staff Memo
, Supplemental Staff Memo
|
|
Sugarloaf Development
|
Washington Street |
7 |
P&Z 21-147 |
Aug 17 , 2023 |
Decision
|
Narrative
, Plan Set
, Landscape Plan
, Transportation Access Plan
, Net-Zero Ready Narrative
, Sustainability Questionnaire
, First Neighborhood Meeting Report
, Second Neighborhood Meeting Report
, Design Review Report
, Land Title Survey
|
Staff Memo
|
|
WashDev2, LLC
|
White St |
32/40/44 |
P&Z 22-054 |
Jul 20 , 2023 |
Decision
|
Narrative
, Architectural Plans
, Landscape Plans
, Site Plans
, Context Analysis
, OSE Documents
, Low Load Building Energy Input Form
, Mobility Division Documents
, Final MMP Approval Letter
, TIS Appendices
|
Staff Memo
|
|
SGL Development, Inc.
|
Radcliffe Rd |
36 |
P&Z 23-024 |
Jul 19 , 2023 |
Decision
|
Narrative
, Plot Plan
, Plan Set
, Neighborhood Meeting Report
|
Staff Memo
|
|
Eva Wang
|
Somerville Ave |
391-395 |
P&Z 23-039 |
Jul 19 , 2023 |
Decision
|
Narrative
|
Staff Memo
|
|
Isaias and Victor Martins
|
Middlesex Ave |
120-132 |
P&Z 23-059 |
Jul 19 , 2023 |
Decision
|
Narrative
|
Staff Memo
|
|
DWCH Assembly Row, LLC
|
Rogers Avenue |
118 |
P&Z 23-036 |
Jul 19 , 2023 |
Decision
|
Narrative
, Plans
, Presentation
|
Staff Memo
|
|
Valerie Humblet
|
Allen Street |
34 |
P&Z 23-028 |
Jul 19 , 2023 |
Decision
|
Special Permit Narrative
, Plan Set
, Landscape Plan
, Abutting Context Analysis
, Letter from Landscape Architect
, Neighborhood Meeting Report
|
Staff Memo
|
|
Pasquale Family Trust
|
Lake Street |
29 |
P&Z 23-033 |
Jul 19 , 2023 |
Decision
|
Narrative
, Plans
, Plot Plan
|
Staff Memo
|
|
Esther Silberstein and David Mlaver
|
Fountain Avenue |
27 |
P&Z 23-037 |
Jul 19 , 2023 |
|
Narrative
, Plot Plan
, Proposed Plan
, Architectural Plans
|
Staff Memo
|
|
Andrea Traviglia & Andre Pelletier
|
Clyde Street |
14 |
P&Z 23-046 |
Jun 14 , 2023 |
Decision
|
Hardship Variance Narrative
, Architectural Plans
, Site Plan
|
Staff Memo
|
|
Rajiv and Anupama Raman
|
Medford Street |
16 & 20 |
P&Z 23-012 |
Jun 01 , 2023 |
Decision
|
Parking Relief Narrative
, Plan Set - 3/2023
, Parking Study
, Neighborhood Meeting Report
, Transportation Access Plan
, Previously Approved Mobility Management Plan
, Plan Set - 7/2023
, Updated NM Report
|
Staff Memo
, Supplemental Staff Memo
|
|
Somerville Living, LLC
|
Broadway |
366 |
P&Z 21-175 |
Jun 01 , 2023 |
Decision
|
Narrative
, Plan Set
, Land Title Survey
, Neighborhood Meeting Report
, Design Review Report
, Mobility Management Plan
, Transportation Access Plan
, Sustainability Narrative
, Net Zero Narrative
, Passive House Feasibility Study
, Unit Matrix
, Revised Plan Set
, Summary of Changes Letter to PB
|
Staff Memo
, Supplemental Staff Memo
|
|
366 Broadway, LLC
|
Medford Street |
16 & 20 |
P&Z 23-011 |
Jun 01 , 2023 |
Decision
|
Narrative
, Summary of Revisions
, Major Amendment Confirmation Letter
, Plan Set
, Land Title Survey
, Site Plan Approval Decision
, Special Permit Decision
, Revised Plan Set
, Letter to PB Regarding Revisions
, Updated NM Report
, LEED Narrative & Scorecard
, Passive House Narrative
, Sustainability Questionaire
|
Staff Memo
, Supplemental Staff Memo
|
|
Somerville Living, LLC
|
Prospect St |
51 |
P&Z 21-181 |
May 04 , 2023 |
Decision
|
Narrative
, Abutting Context Narrative
, Renderings
, Plans
, Neighborhood Mtg 1 Report
, Neighborhood Mtg 2 Report
, Neighborhood Mtg 3 Report
, Applicant Response to Planning Board
, Revised Landscape Plan
, Revised Illustrative Site Plan
|
Staff Memo
, Supplemental Staff Memo - 5/11/23
, Supplemental Staff Memo - 5/25/23
|
|
Eversource Energy
|
Trull Street |
45 |
P&Z 22-168 |
May 03 , 2023 |
|
|
Staff Memo
|
|
Alexandra Teyssandier
|
Francesca Ave |
21 |
P&Z 23.001 |
May 03 , 2023 |
|
|
Staff Memo
|
|
Manuel apeda and Katherine Jong
|
McGrath Highway |
1 |
P&Z 21-028 |
Apr 20 , 2023 |
Decision
|
Narrative
, Site Plans
, Architectural Plans
, Landscape Plans
, Context Analysis
, Signage Plans
, Mobility Documents
, TIS Appendices
, OSE Documents Pt 1
, OSE Documents Pt 2
, OSE Docs Pt 1 UPDATE
|
Staff Memo
|
|
Somerbridge Hotel, LLC
|
McGrath Highway |
1 |
P&Z 23-032 |
Apr 19 , 2023 |
Decision
|
Narrative
, Site Plans
, Architectural Plans
|
Staff Memo
|
|
Somerbridge Hotel, LLC
|
Broadway |
46 |
P&Z 23-026 |
Apr 06 , 2023 |
Decision
|
Signage Plan
|
Staff Memo
|
|
CRG Graphics
|
Broadway |
114-120 |
P&Z 22-171 |
Apr 06 , 2023 |
Decision
|
Narrative.pdf
|
Staff Memo
|
|
Good Food Restaurant, LLC
|
Ivaloo Street |
18 |
P&Z 22-158 |
Apr 05 , 2023 |
Decision
|
Hardship Variance Narrative
, Site Plan and Elevations
, Land Title Survey
|
Staff Memo
, Supplemental Staff Memo
|
|
Owner(s) Mika Cheng and Dan Flynn
|
Broadway |
483 |
P&Z 2023-016 |
Apr 05 , 2023 |
|
|
Staff Memo
|
|
Tavis Babbitt
|
Broadway |
620 |
P&Z 21-145 |
Mar 15 , 2023 |
Decision - Site Plan Approval
, Decision - Special Permit
|
Neighborhood Meeting 1 Report
, Neighborhood Meeting 2 Report
, Mobility Documents
, Narrative
, OSE Documents
, Project Plans
, TAP
, Supplemental Neighborhood Report
, Supplemental Documents 7/13/23
, Conceptual Marking Plan
, Updated TAP
|
Staff Memo
, Supplemental Staff Memo 5/26/23
, Supplemental Staff Memo 7/13/23
, Supplemental Staff Memo - 11/8/23
, Supplemental Staff Memo - 12/14/23
|
|
620 Broadway, LLC
|
Broadway |
595 |
P&Z 23-014 |
Mar 01 , 2023 |
City of Medford Decision
, Decision
|
Extension Request Narrative
, Special Permit Decision
, Previous Extension Decision
|
Staff Memo
|
|
Fidelis Bridge Loan Venture V REO LLC
|
Elm Street |
256-260 |
P&Z 21-039 |
Feb 02 , 2023 |
Decision
|
Version 1 - Narrative
, V1 - Zoning Compliance Table
, V1 - UDC Recommendation
, V1 - Tree Plan
, V1 - TIS
, V1 - TAP
, V1 - MMP
, V1 - Sun Study
, V1 - Sustainability Documents
, V1 - Site Plan
, V1 - Signage Plan
, V1 - Shadow Study
, V1 - Rooftop Mechanical
, V1 - Renderings
, V1 - Plot Plan
, V1 - Plat Plan
, V1 - NM 1 Report
, V1 - NM 2 Report
, V1 - Lighting Plan
, V1 - LEED Scorecard
, V1 - Building Sections
, V1 - Building Plans
, V1 - Building Elevation
, V1 - Area Calculations
, V1 - Mobility CRM
, V1 - OSE CRM
, V1 - Roof Plan
, V1 - Updated Area Calculations
, V1 - Renderings
, Version 2 - Narrative
, V2 - Building Elevations
, V2 - Building Sections
, V2 - Design Review Report
, V2 - Floor Plans
, V2 - Green Score Documents
, V2 - Area Calculations
, V2 - Lighting Plan
, V2 - MMP
, V2 - NM Report 1
, V2 - NM Report 2
, V2 - Plat Plan
, V2 - Plot Plan
, V2 - Site Plan
, V2 - Signage Plan
, V2 - Shadow Study
, V2 - Sustainability Documents
, V2 - TAP
, V2 - TIS
, V2 - TIS Appendices
, V2 - Tree Plan
, V2 - Zoning Compliance Table
, Planning Board Presentation - March 16, 2023
|
Staff Memo
, Supplemental Staff Memo
, Staff Memo - 3/9/23
, Supplemental Staff Memo - 3/31/23
|
|
AP Davis Square Plaza, LLC
|
Elm Street |
270 |
P&Z 21-042 |
Feb 02 , 2023 |
Decision
|
Version 1 - Narrative
, V1 - UDC Recommendation
, V1 - Site Plan
, V1 - Sustainability Documents
, V1 - Site Furnishings Plan
, V1 - Plot Plan
, V1 - Lighting Plan
, V1 - Layout Plan
, V1 - Landscape Plan
, V1 - Design Review Report
, V1 - Conceptual Grading & Drainage Plan
, V1 - Civic Space Zoning Table
, V1 - Civic Space Study
, V1 - Civic Space Signage Regulation Plans
, V1 - Civic Space Signage Plans
, V1 - Illustrative Site Plan
, V1 - Plaza Renderings
, V1 - NM 1 Report
, V1 - NM 2 Report
, Version 2 - Narrative
, V2 - Civic Space Signage Plans
, V2 - Civic Space Study
, V2 - Conceptual Grading & Drainage Plan
, V2 - Design Review Report
, V2 - Illustrated Furnishings Plan
, V2 - Illustrative Site Plan
, V2 - Landscape Plans
, V2 - Layout Plan
, V2 - Lighting Plan
, V2 - Plat Plan
, V2 - Plot Plan
, V2 - NM 1 Report
, V2 - NM 2 Report
, V2 - Site Plan
, V2 - Tree Plan
, V2 - Zoning Compliance Table
, Planning Board Presentation - March 16, 2023
|
Staff Memo
|
|
AP Davis Square Plaza, LLC
|
McGrath Hwy |
200 |
P&Z 22-097 |
Jan 05 , 2023 |
Decision
|
Application
, Transportation Access Plan
, Program Change Memo
|
Jan 19 Staff Memo
, Feb 10 Staff Memo
, Feb 24 Staff Memo
, March 31 Supplemental Staff Memo
|
|
US McGrath Owner, LLC
|
Morrison Ave |
231 |
P&Z 22-143 |
Dec 14 , 2022 |
Decision
|
Hardship Variance Narrative
, Additional Hardship Variance Narrative
, Land Title Survey
, Pergola Drawing
, Photos of Constructed Pergola
, Reference Materials for ZBA
, Letter to ZBA on History of Japanese Wisteria
, Hardship Variance Argument
|
Staff Memo
|
|
Owner David Fang
|
Beacon Street |
292-294 |
P&Z 22-167 |
Dec 14 , 2022 |
Decision
|
Narrative
|
Staff Memo
|
|
Capital Equity Partners
|
Hamilton Rd |
42-44 |
P&Z 22-111 |
Nov 30 , 2022 |
Decision
|
Narrative
, Site & Floor Plans
, Neighborhood Meeting Report
, Plan Set
, Accessibility Exhibit
|
Staff Memo
, Supplemental Staff Memo 12/29/22
, Supplemental Staff Memo 2/9/23
|
|
Owner Jusan Yang
|
Derby Street |
74 |
P&Z 21-193 |
Nov 30 , 2022 |
Decision
|
Hardship Variance Narrative
, Land Title Survey
, Plans
, Existing Condition Plans
, Model Renderings
, Photos of Existing Conditions 1
, Photos of Existing Conditions 2
, Existing Conditions Exhibit
|
Staff Memo
|
|
Owners Michael and Andrea Keenan
|
Broadway |
620 |
P&Z 22-138 |
Nov 30 , 2022 |
Decision
|
Narrative
|
Staff Memo
|
|
620 Broadway LLC
|
Broadway |
299 |
P&Z 22-092 |
Nov 30 , 2022 |
Decision
|
Narrative 11/8/22
, Submission Forms 11/8/22
, Mobility Package 11/8/22
, Mobility Appendices 11/8/22
, Sustainability & Environment Package 11/8/22
, Site Plans - Site-Wide 11/8/22
, Lot 1/Building A Plans 11/8/22
, Lot 1/Sewall Park Plans 11/8/22
, Lot 2/Building B Plans 11/8/22
, Lot 2/Civic Plaza Plans 11/8/22
, Lot 3 Plans 11/8/22
, Lot 4 Plans 11/8/22
, Shadow Study 11/8/22
, Waiver List 11/8/22
, Waiver List 12/8/22
, Green Score Package 12/7/22
, Site Plans - Site Wide 1/12/23
, Lot 2/Civic Plaza Plans 1/12/23
, Waiver List 1/12/23
, Lot 1/Sewall Park Plans 1/12/23
, Mobility Package 1/12/23
, PB Recommendation 1/12/23
, Waiver List 1/19/23
, Lot 1/Building A Plans 1/12/23
, Lot 1/Building A Plans 1/26/23
, Lot 2/Building B Plans 1/12/23
, MMP Decision 1/26/23
|
Staff Memo 11/22/22
, Supplemental Staff Memo 12/9/22
, Staff Memo 1/27/23
, Draft Conditions of Approval
|
|
Mark Development LLC, Beacon Communities Services LLC, and RISE Together LLC
|
South Street |
153 |
P&Z 22-108 |
Oct 27 , 2022 |
Decision
|
Narrative
, Draft Lotting Plan
, Subdivision Plan of Land
, Subdivision Plan of Land for Registered Land
|
Staff Memo
|
|
Owner Boynton Yards LandCo, LLC
|
South Street |
153 |
P&Z 22-008 |
Oct 27 , 2022 |
Decision
|
Narrative
, Plans
, Meeting Reports
|
Staff Memo
, Supplemental Staff Memo
|
|
Owner Boynton Yards LandCo, LLC
|
Harding Street |
2, 8, & 29 |
P&Z 22-007 |
Oct 27 , 2022 |
Decision
|
Narrative
, Plans
, Meeting Reports
, Landscape & Green Score Plans
, Sustainability Documents
, Transportation Documents
, Transportation Access Plan
, Environmental Impact Documents
, Existing Tree Removal Plan
, Revised Meeting Report
, Revised Ground Floor Plan
|
Staff Memo
, Supplemental Staff Memo
|
|
Owner Boynton LandCo, LLC
|
Berkeley Street |
36 |
P&Z 22-068 |
Oct 26 , 2022 |
Decision
|
Hardship Variance Narrative
, Plot Plan
, Plan Set
|
Staff Memo
|
|
Owners Erich Ludwig and Allision Ross
|
Washington St |
10 |
P&Z 21-134 |
Sep 08 , 2022 |
Decision
|
Narrative
, Plan Set
, MMP
, Neighborhood Meeting Report
, Design Review Report
, Plot Plan
, TAP
, TIS
, Sustainable & Resilient Buildings Questionnaire
, LEED Certifiability Documentation
, Landscape Plans
, Public Realm Site Plan
, Green Score
|
Staff Memo
|
|
Paradigm Direct Roland, LLC
|
Central St. |
141 |
P&Z 21-104 |
Sep 07 , 2022 |
|
Plans
, Project Narrative
, Neighborhood Meeting Report
|
Staff Memo
|
|
Tobin Wells
|
Oak St |
10 |
P&Z 21-132 |
Sep 07 , 2022 |
Decision
|
Narrative
, Site Photos
|
Staff Memo
, Supplemental Staff Memo
|
|
Fidelis Bridge Loan Venture V REO LLC
|
McGrath Hwy |
394 |
P&Z 21-122 |
Aug 18 , 2022 |
Decision
|
Plans
, TAP
, Sustainability Letter Stage 1
, Sustainability CRM
, Affordable Housing Acknowledgement
, UDC Recommendation
, Neighborhood Mtg 1
, Neighborhood Meeting 2
, Updated Plan Set
, Final Plan Set
|
Staff Memo
, Supplemental Staff Memo
, Supplemental Staff Memo 2
, Supplemental Staff Memo 3
|
|
Contempo Builders
|
Assembly Row |
325-375 |
P&Z 22-101 |
Aug 18 , 2022 |
Decision
|
Fire Feature Plans
, Bocce Area Plans
|
Staff Memo
|
|
Street Retail, LLC
|
Bow St |
59 |
P&Z 21-017 |
Aug 18 , 2022 |
Decision
|
Plans
, Narrative
, TAP
, UDC Recommendation
, Neighborhood Mtg 1
, Neighborhood Mtg 2
, Shadow Study
, Updated Unit and Landscaping Drawings
, Bow St 59 - Plans (Updated)
, Bow St 59 - Summary of Changes
|
Staff Memo
, Staff Memo (Supplemental)
, Staff Memo (Supplemental 2)
|
|
59-61 Bow St., LLC
|
Elm St |
231-249 |
P&Z 21-068 |
Aug 04 , 2022 |
Decision
|
Narrative
, Plan Set
, Plot Plan
, Signage and Lighting Plan
, Sustainability Documents
, Landscape Plan Set
, Lighting Documents
, Dark Sky Compliance
, Design Review Report
, Mobility CRM
, MMP
, TIS
, TAP
, Neighborhood Meeting 1 Report
, Neighborhood Meeting 2 Report
|
Staff Memo
, Updated Staff Memo
|
|
Scape Davis Square, LLC
|