Join us every Wednesday in January
for bowling at Flatbread.
Please see flyer for additional details.…
Event |
A Design Informational Meeting will be held by MassDOT to discuss the proposed Route 28 (McGrath Highway) over Gilman Street Bridge replacement (also known as the Gilman Street Bridge) project in Somerville, MA.
WHERE: Michael E. Capuano Early Childhood Center, Cafeteria
150 Glen Street
Somerville, MA 02145
WHEN: Thursday, June 6 2013 at 6.30pm
PURPOSE: The purpose of this hearing is to provide the public with the opportunity to become fully acquainted with the proposed Route 28 (McGrath Highway) over Gilman Street Bridge replacement project (also known as the Gilman Street Bridge). All views and comments made at the hearing will be reviewed and considered to the maximum extent possible.
PROPOSAL: The proposed project consists of replacing the existing three span bridge carrying McGrath Highway over Gilman Street with a single span bridge. The proposed bridge will have two sidewalks and a section of Gilman Street will be reconstructed as part of this project.
Click below for more information.
If applicable, any related agendas, minutes, audio/video recordings, and other materials will appear here.
Join us every Wednesday in January
for bowling at Flatbread.
Please see flyer for additional details.…
This time of year, is a good time to think of a fresh start, not resolutions. Doing something better or something that can improve your life in any way gives you a…
Zumba Gold® uses Latin and international rhythms and is a lowerintensity version of Zumba® for active older adults. It uses easy-tofollow moves that focus on balance, range of motion, and…
Please submit website feedback using this form. Be sure to include:
Thank you for your feedback!